Boxer E * Integrated door closer for single leaf doors with a leaf width of up to 1400 mm with electric hold-open device
- Closing force with variable adjustment of EN 2-4 or EN 3-6
- Can be used for right and left hand doors without conversion
- Door closer is embedded in the door leaf and frame and fulfils the highest design demands
- Electric hold-open device in the guide rail with hold-open area 80°-120°
- Retention force of the hold-open unit is gradually adjustable
- Smoke switch control unit can be connected, whose signal makes the door close automatically in the event of a fire
- Integrated back check, slows down doors that are thrown open forcefully
- Hydraulic latching action which accelerates the door shortly before it is closed
- Closing speed can be individually adjusted
- All functions can be adjusted in the installed state
Application Areas
- Fire and smoke protection doors, proof of suitability for the door required
- Right and left single-action doors
- Single-action doors up to 1400 mm leaf width, for door weight up to 180 kg
- For door leaf thicknesses from 40 mm
- Integrated installation
- Hold-open systems with integrated hold-open device
Technical data
| Boxer E | |
| Closing force in accordance with EN 1154 | EN 2 - 6 |
| Barrier-free in accordance with DIN 18040 up to leaf width (max.) in mm | 1400 mm |
| Leaf width (max.) | 1400 mm |
| Leaf weight (max.) | 180 kg |
| Type of installation | Concealed |
| Opening angle (max.) | 120 ° |
| Input voltage | 24 V DC |
| Electrical power consumption | 2.04 W |
| Suitability for fire protection doors | Yes |
| Closing force adjustable | Yes, stepless |
| Adjustable closing speed | Yes |
| Latching action adjustable | Yes, via valve |
| Back check integrated | Yes, hydraulically adjustable |
| Position of closing force adjustment | Top |
| Hold-open function | Electrical |
| Hold-open range | 80 ° - 120 ° |
Downloads
Product shot
Installation situation
Product data sheet
Installation instructions
Cable plan
Supplementary sheet
Flyer/folder
Product brochure
Declarations of performance
Environmental declaration
Variants & Accessories
* Notice about the products displayed
The products mentioned above may vary in form, type, characteristics and function (design, dimensions, availability, approvals, standards etc.) depending on the country. For questions please contact your GEZE contact person or send us an E-Mail .